Project overview
Mahalapye–Shoshong iron province
PL 0119/2025 is a district-scale exploration opportunity in the Mahalapye–Shoshong iron province of central Botswana. The project targets banded iron formation (BIF) mineralisation interpreted to occur within iron-rich sedimentary sequences associated with the Shoshong Formation and adjacent Proterozoic successions.
Regional interpretation suggests the licence may lie within the northern extension of iron-bearing stratigraphy comparable to the Thabazimbi Iron Formation. This is a geological target to be tested rather than a proven extension, and it is what the work programme is designed to evaluate.
The licence sits inside an established mining and infrastructure corridor carrying coal, power generation, rail and major transport networks, which materially lowers the cost of any future development.
- Licence
- PL 0119/2025
- Holder
- Falcon Metal Resources Botswana (Pty) Ltd
- Size
- 675.92 km²
- Commodity
- Iron ore (Fe)
- Location
- Mahalapye–Shoshong iron province, Central District
- Stage
- Early exploration
- Ownership
- 100%


