PL 0121/2025 – Tati Gold Project



PL 0121/2025 – Tati Gold Project
Holder: Okavango Geomatics & Resources (Pty) Ltd (Falcon Subsidiary)
Size: 10.36 km²
Commodity: Gold (Au)
Location: Tati Greenstone Belt, Botswana
Stage: Advanced Early Exploration
Ownership: 100%
🔍 Overview
This license lies within the historic Tati Goldfield, covering a 3 km prospective structural corridor on the greenstone belt that once hosted the Mupane Gold Mine (now under liquidation). The area includes artisanal pits, exposed quartz veins, and high-grade outcrops.
💎 Key Discoveries
• 26.5 g/t Au in surface quartz reef outcrop
• 3m @ 5.17 g/t Au from 9m, and 1m @ 40.63 g/t Au from 26m in historic RC holes (Power Metal Resources)
🔬 Next Steps
• High-resolution trenching on visible quartz reefs
• Channel sampling & gold zone modelling
• Ground IP surveys
• Initial Falcon-led RC drilling program
